


Categorías: Bandeja de cables ignífuga
Dimensions (Width × Height, unit: mm):
(1) Height 50 Series: 100×50, 150×50, 200×50, 300×50, 400×50
(2) Height 100 Series: 100×100, 150×100, 200×100, 300×100, 400×100, 500×100, 600×100, 800×100
(3) Height 150 Series: 200×150, 300×150, 400×150, 500×150, 600×150, 800×150, 1000×150
(4) Height 200 Series: 300×200, 400×200, 500×200, 600×200, 800×200, 1000×200, 1200×200
(5) Extra‑long Span / Special Widened Cable Tray for Power Plants: 1000×100, 1000×150, 1000×200, 1200×200
Plate Thickness (unit: mm): 1.0/1.2/1.5/2.0/2.5/3.0/3.5
Ⅰ. Product Definition:
Bandeja portacables resistente al fuego de gran luz (modelo GB serie DJ-F, subdividida en tipo escalera DJ-T-F, tipo bandeja DJ-P-F y tipo canal DJ-C-F). El material base está hecho de placas de acero Q235B de alta resistencia engrosadas, con placas laterales onduladas de doble capa y múltiples nervaduras de refuerzo longitudinales en la placa inferior para mejorar la rigidez a la flexión. Después de que todos los accesorios, rectos y doblados estén moldeados integralmente, primero se galvanizan en caliente para protegerlos contra la corrosión y se les imprima, y luego se les rocía con una capa expansiva resistente al fuego. Los modelos de alta gama y alta resistencia al fuego adoptan una placa de acero de doble capa sujeta con una estructura compuesta de algodón resistente al fuego de silicato de aluminio. El producto combina cuatro características principales: tramo de soporte ultragrande, capacidad de carga pesada, resistencia a la corrosión a largo plazo y propiedades ignífugas y resistentes al fuego. Se diferencia de las bandejas resistentes al fuego estándar convencionales de 2 m: la sección única estándar es de 6 m, la luz de soporte convencional es de 3/6 m y el modelo personalizado reforzado puede alcanzar de 9 a 12 m. La deflexión a plena carga se controla estrictamente para que sea ≤ span L/200, con un factor de seguridad de ≥1,5. Está diseñado específicamente para proyectos de cableado contra incendios de carga pesada de larga distancia en fábricas abiertas, cruces de carreteras, cruces de equipos, galerías de tuberías de túneles, etc.
II. Two Major Production Processes
(1) Coated Standard Model (General Industrial Projects) - Enhanced Forming: The standard configuration for the panel is 2.0/2.5mm thickness, with a width of over 600mm, and 3.0~4.0mm thickened steel plates for spans of 6m; the side panels feature double-layer bending and edge rolling, while the bottom panel is integrally stamped with multiple continuous longitudinal reinforcement ribs; the ladder-type model is densified with 150mm ladder rungs to enhance load-bearing capacity; the 6m full panel is prefabricated without segmentation, and includes lifting, grounding, and connection holes, with a complete set of 6m long irregular-shaped parts provided.
Base corrosion protection: Overall hot-dip galvanizing treatment, with a zinc layer thickness of ≥65μm, metallurgically bonded for rust prevention, suitable for outdoor, humid and corrosive environments.
Fire-resistant coating: Multi-layered fire-resistant coatings are applied both internally and externally, and then dried and cured at high temperatures. The dry film thickness for F60 is ≥0.8mm, while for F90/F120, it is ≥1.2~1.5mm.
Fireproofing principle: When exposed to fire at 200~300℃, the coating expands 5~10 times, forming a honeycomb-like dense carbonized thermal insulation layer. This layer isolates high temperatures and blocks heat conduction, ensuring that the cable remains continuously energized for a specified fire-resistant duration in case of a fire.
II Double-layer composite high-fire-resistant type
(diseñado específicamente para túneles, pozos de gran altura y bastidores de tuberías) presenta una estructura de placa de acero de doble capa para los paneles laterales, con un algodón aislante refractario de silicato de aluminio de alta densidad relleno en la capa intermedia. Esto mejora significativamente el rendimiento del aislamiento térmico, logrando un límite de resistencia al fuego estable de 90 a 120 minutos. Es adecuado para líneas principales de incendio críticas, cerradas y de alta resistencia al fuego para la evacuación de personal.
III. Complete set of supporting fireproof large-span accessories and straight-through accessories: Piezas de conexión ignífugas extendidas y engrosadas, pernos galvanizados ignífugos de grado 8,8, cables de puente trenzados de conexión a tierra; piezas de torneado con formas especiales: codos horizontales integrados de 6 m, codos de 45°, codos verticales de subida y bajada, tes, cruces, reductores; accesorios funcionales: placas de cubierta ignífugas de 6 m de largo, placas divisorias metálicas, paneles divisorios ignífugos; sistema de soporte: brazos de soporte resistentes al fuego engrosados, columnas extendidas, soporte sísmico y suspensiones (obligatorio para túneles, pozos y subestaciones).
IV. Six Core Advantages
1. Ultra-large Support Span, Significantly Reducing Comprehensive Construction Cost Standards. For a 6m span, supports are only set up at both ends. Compared to a 2m ordinary fireproof cable tray, the amount of support arms and columns is reduced by more than 60%, reducing steel structure drilling and high-altitude lifting labor. In areas where the factory building spans equipment and roads, there is no need for intermediate columns, which does not obstruct the equipment passage. Although the unit price of the cable tray body is high, the total cost of supports + labor is reduced by more than 30%.
2. Thickened and reinforced structure, ultra-high heavy-duty, long-term non-deflection deformation double-layer crimping + multi-channel longitudinal reinforcement mechanical structure, 6m span rated uniform load 300~1000kg/m, full-load sag strictly controlled within specification limits; capable of carrying multi-circuit heavy-duty high-voltage fire protection cables, with no twisting or permanent deformation under long-term heavy load, and excellent seismic performance.
3. Hot-dip galvanizing + fire-resistant double-layer protection, suitable for harsh environments. The thick zinc layer on the bottom layer is resistant to rainwater, high salt spray, mild acids and alkalis, and high humidity, while the outer layer of expanded fire-resistant coating meets fire-resistant requirements for firefighting. Coastal power plants, chemical plants, wastewater treatment plants, and open-air pipe racks can simultaneously address the dual needs of corrosion prevention and fire resistance, with a service life of 20 to 30 years and no need for frequent maintenance in the later stages.
4. The six-meter ultra-long single section significantly enhances construction efficiency. With a single-piece integrated design, the number of splicing joints is reduced by 2/3, minimizing the risks of grounding discontinuities, smoke leakage through gaps, and water leakage. The speed of high-altitude long-distance through-lifting construction is increased by 50%, effectively shortening the project duration.
5. Three structural options are available, covering ladder, tray, and trough structures for full-scene fire protection wiring. It can accommodate both high-power fire protection power cables and enclosed shielded wiring for instruments and weak current communication. A single large-span system meets all the strong and weak current fire protection backbone wiring needs in the factory area.
6. The fire resistance is complete and uniform, successfully passing the fire safety inspection. The entire set of cable trays, covers, bends, and supports have undergone simultaneous fireproofing treatment, with no local shortcomings in fire resistance. We can provide a full set of third-party EI30/EI60/EI90/EI120 fire safety inspection reports, meeting the rigid requirements of fire safety regulations for high-rise buildings, tunnels, and civil air defense.
Ⅴ. Applicable Scenarios:
1. Large steel structure factories and logistics warehouses: open roofs without columns, with dense and heavy-duty main fire protection high-voltage cables;
2. Chemical plants, oil refineries, wastewater treatment plants, coastal power plants, and offshore wind power platforms: high salt spray corrosion environment + dual requirements for fire resistance and fire protection;
3. Urban utility tunnels, highway tunnels, underground cable trenches, and overhead fire protection lines crossing roads in factory areas;
4. Substations, photovoltaic/wind farms, and metallurgical blast furnace areas: large amounts of 10kV high-voltage fire protection cables laid centrally;
5. Airports, high-speed rail stations, and large exhibition venues: high-altitude long-distance fire protection main cables with a height of over 8m;
6. Equipment-intensive factory areas, where cross-equipment fire protection wiring areas cannot be provided with additional support columns in the middle.
VI. Key Points of Construction and Installation Specifications
1. Support arms, columns, and connecting bolts must all be equipped with thickened fire-resistant large-span specialized components. It is prohibited to mix ordinary thin fire-resistant components to avoid insufficient load-bearing capacity and electrochemical corrosion.
2. For the high-altitude lifting of six-meter-long trays, two-point synchronous lifting shall be adopted to prevent unilateral twisting and deformation. For spans >6m, intermediate load-bearing support columns must be added.
3. Each section of the tray along the entire line shall be installed with grounding braided jumper wires. Additional repeated grounding shall be provided for tunnels, high-rise shafts, and chemical substations to ensure continuous equipotential conduction.
4. For the laying of strong and weak electrical cables in the same tray/trough with large spans, metal dividers must be installed for complete isolation. For outdoor, dusty, pipe racks, and shafts, 6m-long fireproof cover plates shall be provided throughout.
5. For spans of six meters and above, as well as high-voltage fire protection main lines, seismic support hangers shall be provided according to specifications.
6. Immediately apply fireproof patching paste to the cut, ground, and drilled sections during on-site cutting, grinding, and drilling to fully restore the fireproof and thermal insulation layer.
7. After installation, the full-load deflection of the tray shall be reviewed. The sagging amount shall not exceed 1/200 of the span. If the standard is exceeded, support points shall be densified.
8. Special fireproof sealing materials shall be provided for trays passing through walls and floor holes to block the longitudinal spread of flames and smoke along the tray.
Copyright © 2026 Hebei Jitong Cable Tray Co., Ltd. Todos los derechos reservados. privacy policy